CLICK HERE FOR FREE BLOGGER TEMPLATES, LINK BUTTONS AND MORE! »

Tuesday, August 14, 2012

Kitchen Progress

I have been meaning to post about kitchen progress for awhile now but as things kept getting done I'd think...Oh wait...maybe I'll wait until we get *** done.  Well, so far we've ripped out a wall between the kitchen and dining room to open it up, tore out all of the plaster/lath in the former kitchen, plumbed new sink plumbing, sheetrocked, mud, taped, textured, primed, painted, electrical, cabinets. Phew.  It's been a LONG process. It's involved more time, stress, and money than we ever imagined but...it's almost done.

All we have left is trim, countertop, sink, backsplash, and flooring.

Here are some photos of the (long) process thus far.
Ripping out the wall
Ripping out the wall


The boys taking a break from the physical labor


Kitchen Before

Kitchen Before w/ wall still in tact

The Boys on sheetrock day
Sheetrock/mud done
Walls primed




Ripping out the dining room wall
Kitchen progress...


Kitchen progress



1 comments:

Unknown said...

Looking great, Amy! Can't wait to see more!